By mid January work began on the extension to the spawning channel. It was a chance to learn more about the habits and life of cutthroat. A fairly wide deep channel was dug and ground water from phase one and two connected. On both sides of the channel, shelves were shaped to support planting.
On the base of the channel large rocks and tree trunks were placed to for a natural habitat to provide shelter.
